10.00am – I came to the office. Although the outside door is open, the inside door is locked, thus I can’t enter.
10.30am – My co-worker Jason came. We then enter the office.
I remember last time that Mr Micheal asks me to add more props to my interior castle scene. I decided to use a plane attached with picture to save time. I search the net for several picture of statue.
Around 1.30pm – I go out to lunch
Around 2.00pm – I’m back to the office.
Suddenly, Ms Winny called my co-worker Jason. She asks us to come to the ground floor to pick up new sets of computer from Mr Micheal car.
Once we picked the item, we bring it to the office. Then we open up the boxes and install the pieces until the PC ready to be used. While I finish my job, Jason continue by installing some software to those PCs.

I continue working on the scene. The picture of statue that I get from the net needed to be cleaned before I can use it on the plane. I need to erase the background and save it as PNG where the alpha channel is stored. The alpha channel is used for the plane to register the shape of the statue. If I didn’t use the alpha channel, the plane will look square and will not follow the shape of the statue.
I add a plane of vase and chandelier light to the scene.
Around 4.00pm – I tweak the lighting of the interior castle to get as realistic as possible.

Around 6.00pm - I have finish render the test scene. Now its time to render the animation. The animation consists of camera move and zooming into a place where the character should be.

Around 7.30pm -The render isnt finish yet, and there is still about 50minutes remaining. Mr Micheal give permission to dismiss while leaving the computer on.